Thursday, 24 November 2011
St Nicolas' steps
Tree surgeons have been in St Nicolas’ churchyard for the last three days and have finally tidied up branches and whole trees in which dead wood had gradually accumulated or which had become dangerous last winter or which threatened to interfere with neighbours roofs. With this, and with the support of two volunteers (one long standing from Great Coates village, and one recruited this year through a local volunteering scheme), we have also been able to put the churchyard to bed for the winter in a safer and tidier manner than we might have hoped.
But, with two steps forward, there are also two steps backwards. The diocese has drained down the water in the empty Vicarage next door as required by its insurer to prevent burst pipes this winter suddenly depriving the church of the use a loo and an external tap. And the crack in the south aisle wall which we thought we’d put right earlier in the year has opened up again so we have had to get the Archdeacon’s permission to engage a structural engineer to make a more substantial investigation. Neither is that important in itself, but these sorts of things add to the slight sense the church has that the odds stack up against it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment